PRINCIPAL | PROJECT/CLIENT | SCOPE OF WORK | VALUE |
Nooter/Eriksson-CCT, S.R.L 121013 Gallarate, Varese Italy | Supply of Boilers, ADWEA, Shuweihat Power Plant | Engineering Services, Manufacturing & Supply of Package Boilers, Industrial Boilers, Heat Recovery Steam Generators, Waste Heat Recovery Boilers, Revamping of Industrial & Heat Recovery Boilers | US$42M |
Cegelec International Ltd West Midlands, United Kingdom | BUHASA ICS Project | Engineering, Procurement, Supply, Construction and Commissioning of BUHASA ICS project in Abu Dhabi | US$23M |
Raytheon Systems Company Air Traffic Management System, Abu Dhabi-UAE | Supply of Radars to Abu Dhabi and Al Ain Airports, Department of Civil Aviation | Sales of Radar DATA processing, flight Data Processing & Display Systems. Solid State L&S band Radars, Air Traffic Navigation, Integration and Coordination Systems | US$33M |
Gemplus Middle East FZ LLC. Dubai Internet City, Dubai – UAE | National ID Program, Ministry of Interior | UAE Smart Card Project with the MOI | €12M |
Black & Veatch Pritchard Inc. | OGDI, GASCO | Engineering, Procurement, Construction and Commissioning of OGD II in Abu Dhabi | US$100M |
Linde | Polyethylene Plant, Borouge | Borouge Polyethylene Plant Licensors | US$640M |
Washington Entreprises Emirates LLC | FEED Sulphur Handling, TAKREER | Contract for Front End Engineering and Design Services (FEED) for the Ruwaiss Sulphur Expansion | US$16M |
Q-MAC | Signals Corp | HF radios | |
NET | Signals Corp | Providing of Logistics Equipment Contract | |
Rizzani de Eccher | Central Market | Civil Works | US$40M |
Rizzani de Eccher | Grand Mosque | Civil Works | US$215M |
Macchi | Water & Electricity Department | Boilers | US$50M |
CIMEL | Water & Electricity Department | Civil Works | US$52M |
Macchi | ADGAS | FD Fans | US$20M |
Stroy Trans Gas | Dolphin | EPC Contract, Tawela-Fujaira Pipeline 244 Km 48” Gas Pipeline | US$417,741,309 |
Rizzani De Echer | AlFara General Contracting Company/ Jebel Hafeet Project | Design & Construction of 2 small bridges to connect Royal Palace with belvedere, also excavation works, soil consolidation and construction of two small bridges | AED40,595,373 |
Great Lakes Dredge Co | Dredging International NV | Dredging & Reclamation Works | US$13,744,074 |
Great Lakes Dredge Co | NMDC | NMDC, H.H SHEIKH SAIF ISLAND | US$ Over 10M |
Great Lakes Dredge Co | NMDC | NMDC, CORNICHE BEACH | US$ Over 10M |
J P Kenny | Zadco | Zadco-Oil Water Treatment | US$14M |
J P Kenny | Gasco | Gasco-Natural Gas Distribution Network | AED 43,407,935.80 |
S&T Corporation | Technimont | JGC-Technimont Air Cooled Heat Exchangers | Euro710,322 |
Delta International Building Materials | Stroytransgaz | Stroytransgas-Heat Shrink Sleeves Supply | US$1,897,269 |
Matrikon | Consolidated Contracting Engg & Procurement | Supply of Alarm Management Systems (AMS) | US$1,064,678.99 |
Macchi | Linde | Linde Ruwais Project | Euro 16,965,700 |
Macchi | Samsung | Samsung Fertil 2 Project | US$14,944,860 |
Macchi | Petrogas-GS | Petrofac-GS Ruwais 4th NGL MP Steam Boiler Package | Euro 17,970,000 |
Macchi | Petrogas-GS | Petrofac-GS Ruwais 4th NGL Vacuum Deaerator Package | Euro 1,048,160 |
Sices S.p.A | Technimont | JGC-Tecnimont N.8 LG coalescers Supply | Euro 9,097,728 |
Sices S.p.A | Technimont | Technimont PP/PE Ruwais (AE) EPC Borouge 2 | Euro 1,073,000 |
Sices S.p.A | Technimont | Technimont PP/PE Ruwais (AE) EPC Borouge 1 | Euro 8,145,000 |
Invensys Middle East | ADGAS | ADGAS Train3 Operator Training Simulator Project | US$960,000 |
Techno Process Equipment | GASTECH | Fabrication & Supply of Vessel Complete with Internals | RS 53,900,000 |
UOP | Takreer | Takreer-Carbon Black & Delayed Coker Project | US$5,841,007 |